New projects in Bengaluru Rural

Every project in Bengaluru Rural that files its sales and construction with Karnataka RERA, as filed.

Brokers: this week’s stock sheet for Bengaluru Rural →

Booked so far

30063 of 56618

Across 223 projects, at each one's latest filing.

Booked in Q2 2026-27

1

By the 5 projects that filed both of the last two quarters; 4 of them booked none.

Devanahalli · 103 projects

  • Barca At Godrej MSR City

    M S RAMAIAH VENTURES LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    57 of 57 homes booked · 19% built · 30% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2030

  • Barca II At Godrej MSR City

    M S RAMAIAH VENTURES LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    593 of 602 homes booked · 16% built · 23% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2030

  • Def Col-Peace Haven

    ORGANIZE INDIA REAL ESTATE DEVELOPMENTS LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 52 plots booked · 75% developed · 50% of the promised time used · Q2 2026-27 filing · completion promised 23 Jun 2027

  • Greybrick -Talking to the Clouds

    GREYBRICK PROJECTS LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 31 plots booked · 60% developed · 12% of the promised time used · Q2 2026-27 filing · completion promised 20 Apr 2029

  • Highgrove

    SAMANVI ESTATES LLP · Devanahalli, Bengaluru Rural · Plotted Development

    5 of 153 plots booked · 80% developed · 5% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2028

  • Hillcrest Haven

    M/s Chhabindra Kumar Pradhan · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 38 plots booked · 80% developed · 34% of the promised time used · Q2 2026-27 filing · completion promised 30 May 2028

  • Aarohana Adira

    AAROHANA PROJECTS · Devanahalli, Bengaluru Rural · Residential/Group Housing

    0 of 140 homes booked · 4% built · 0% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Abhi Homes

    ABHI DEVELOPERS · Devanahalli, Bengaluru Rural · Residential/Group Housing

    9 of 292 homes booked · 68% built · 93% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2026

  • Aeropolis, a project of Sattva Group

    TRINAYANI REALTOR PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    938 of 1001 homes booked · 89% built · 99% of the promised time used · Q1 2026-27 filing · completion promised 9 Jul 2026

  • Arvind Orchards

    Arvind Smart Homes Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    264 of 313 plots booked · 100% developed · 41% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Arvind Orchards Phase-2

    Arvind Smarthomes Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    20 of 70 plots booked · 80% developed · 12% of the promised time used · Q1 2026-27 filing · completion promised 29 Dec 2029

  • Arvind The Park

    Arvind Homes Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    256 of 340 plots booked · 84% developed · 27% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Assetz City of Palms

    ASSETZ INVESTMENTS AND HOLDINGS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 620 plots booked · 84% developed · 0% of the promised time used · Q1 2026-27 filing · completion promised 15 Feb 2029

  • Aurum at Brigade El Dorado

    Brigade Tetrarch Private Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    477 of 477 homes booked · 81% built · 67% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Aurum Valley

    BANGARUKADIYALA SYED MUNAF · Devanahalli, Bengaluru Rural · Plotted Development

    43 of 43 plots booked · 100% developed · 48% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Birla Trimaya Phase-2

    BIRLA ARNAA LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    470 of 473 homes booked · 19% built · 38% of the promised time used · Q1 2026-27 filing · completion promised 20 Jun 2029

  • Birla Trimaya Phase-3

    BIRLA ARNAA LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    439 of 463 homes booked · 4% built · 25% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2030

  • Birla Trimaya Phase-4

    Birla Arnaa LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    447 of 518 homes booked · 2% built · 7% of the promised time used · Q1 2026-27 filing · completion promised 15 Dec 2031

  • Birla Trimaya-Phase-I

    BIRLA ARNAA LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    555 of 556 homes booked · 63% built · 55% of the promised time used · Q1 2026-27 filing · completion promised 31 Oct 2028

  • Brigade Oasis - Phase 1

    Brigade Enterprises Ltd · Devanahalli, Bengaluru Rural · Plotted Development

    306 of 307 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • Brigade Oasis - Phase 2

    Brigade Enterprises Ltd · Devanahalli, Bengaluru Rural · Plotted Development

    216 of 221 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • Brigade Oasis - Phase 3

    Brigade Enterprises Ltd · Devanahalli, Bengaluru Rural · Plotted Development

    443 of 460 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • Brush Strokes BY MH

    MH Properties · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 81 plots booked · 8% developed · 17% of the promised time used · Q1 2026-27 filing · completion promised 28 Jan 2029

  • Century Trails Phase 2

    Century Trails LLP · Devanahalli, Bengaluru Rural · Plotted Development

    28 of 49 plots booked · 100% developed · 35% of the promised time used · Q1 2026-27 filing · completion promised 31 May 2028

  • Classic Merusri Canaan Phase - II

    MERUSRI DEVELOPERS · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 66 plots booked · 62% developed · 11% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • DNR Solace

    DNR Corporation Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 432 plots booked · 97% developed · 82% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Earthsong BY Manyata Phase-5a

    Manyata Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Plotted Development

    216 of 216 plots booked · 68% developed · 68% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Earthsong BY Manyata Phase-5B

    Manyata Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Plotted Development

    154 of 154 plots booked · 59% developed · 68% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Ebony at Brigade Orchards

    BCV Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    206 of 232 homes booked · 36% built · 33% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2029

  • Embassy Greenshore

    EMBASSY DEVELOPMENTS LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    621 of 878 homes booked · 10% built · 10% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2031

  • Embassy Paradiso

    EMBASSY DEVELOPMENTS LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 48 plots booked · 95% developed · 45% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2027

  • Embassy Springs - Phase 2a, Apartments

    EMBASSY DEVELOPMENTS LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    673 of 826 homes booked · 72% built · 84% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Embassy Verde

    EMBASSY DEVELOPMENTS LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    1034 of 1044 homes booked · 20% built · 26% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Fairmont at Brigade Orchards

    BCV Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    92 of 92 homes booked · 99% built · 63% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Fortius Good Earth

    RS-GK REAL ESTATES LLP · Devanahalli, Bengaluru Rural · Plotted Development

    19 of 63 plots booked · 30% developed · 30% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Heritage Enclave

    IG3 Infra Limited · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 118 plots booked · 16% developed · 2% of the promised time used · Q1 2026-27 filing · completion promised 15 Dec 2029

  • Hydenben Clifton

    HYDENBEN DEVELOPERS LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    35 of 98 homes booked · 27% built · 39% of the promised time used · Q1 2026-27 filing · completion promised 2 Apr 2028

  • Impact Sanvi Aero Gardens

    SANVI CONSTRUCTIONS · Devanahalli, Bengaluru Rural · Residential/Group Housing

    62 of 316 homes booked · 41% built · 37% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2028

  • Ivc Northshire Address

    Indiabuild Realty Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    59 of 105 plots booked · 85% developed · 41% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Ivory Phase 1 at Brigade Orchards

    BCV Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    454 of 457 homes booked · 100% built · 90% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2026

  • Ivory Phase 2 At Brigade Orchards

    BCV Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    487 of 487 homes booked · 83% built · 63% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Konig North County

    Konig Homes · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 99 plots booked · 78% developed · 52% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Konig Pearl County 1

    Konig Homes · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 74 plots booked · 55% developed · 20% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Konig Pearl County 2

    Konig Homes · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 136 plots booked · 55% developed · 20% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Kumar Palazzio

    Kumar Vista Properties LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    2 of 29 homes booked · 6% built · 13% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2030

  • Laurel & Maple at Brigade Orchards

    BCV Developers Pvt Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    81 of 311 homes booked · 13% built · 8% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2030

  • Legacy Mihira

    LEGACY GLOBAL PROJECTS PVT LTD · Devanahalli, Bengaluru Rural · Plotted Development

    13 of 279 plots booked · 10% developed · 17% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Madhuban

    SIDHARTH MADHUBAN · Devanahalli, Bengaluru Rural · Plotted Development

    26 of 128 plots booked · 95% developed · 47% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2028

  • Merusri Sienna 1

    Merusri Sienna Developers Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 107 plots booked · 0% developed · 4% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2031

  • Merusri Sienna II

    Merusri Estate Holdings Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 113 plots booked · 0% developed · 0% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2031

  • Merusri Sunscape

    MERUSRI SUNSCAPE LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    14 of 76 homes booked · 15% built · 21% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2030

  • Merusri Swamy Orchards

    MERUSRI DEVELOPERS · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 119 plots booked · 89% developed · 33% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2030

  • MVN Aero One T5 & T6

    MF FARMLANDS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    107 of 137 homes booked · 95% built · 71% of the promised time used · Q1 2026-27 filing · completion promised 20 Jul 2027

  • MVN Aero One Tower 4

    MF FARMLANDS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    49 of 54 homes booked · 99% built · 85% of the promised time used · Q1 2026-27 filing · completion promised 20 Dec 2026

  • Natures Sign BY Shreyas

    SHREYAS INFRA PROJECTS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    1 of 124 plots booked · 10% developed · 25% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2028

  • Park Cubix Phase 2

    Sattva Resi Private Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    481 of 798 homes booked · 40% built · 29% of the promised time used · Q1 2026-27 filing · completion promised 15 Sept 2029

  • Prakriti Meadows

    MSR DEVELOPRS · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 99 plots booked · 55% developed · 11% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Prestige Autumn Leaves

    PRESTIGE ESTATES PROJECTS LTD · Devanahalli, Bengaluru Rural · Plotted Development

    208 of 240 plots booked · 42% developed · 50% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Prestige Crystal Lawns

    PRESTIGE ESTATES PROJECTS LTD · Devanahalli, Bengaluru Rural · Plotted Development

    190 of 235 plots booked · 38% developed · 50% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Prestige Gardenia Estate

    PRESTIGE ESTATES PROJECTS LTD · Devanahalli, Bengaluru Rural · Plotted Development

    516 of 516 plots booked · 66% developed · 57% of the promised time used · Q1 2026-27 filing · completion promised 30 Apr 2027

  • Prestige Gardenia Estate Phase 2

    PRESTIGE ESTATES PROJECTS LTD · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 195 plots booked · 1% developed · 4% of the promised time used · Q1 2026-27 filing · completion promised 31 Oct 2027

  • Prestige Greenbrook

    PRESTIGE ESTATES PROJECTS LTD · Devanahalli, Bengaluru Rural · Plotted Development

    254 of 324 plots booked · 26% developed · 50% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Prestige Marigold Phase II

    ACE REALTY VENTURES · Devanahalli, Bengaluru Rural · Plotted Development

    523 of 717 plots booked · 64% developed · 27% of the promised time used · Q1 2026-27 filing · completion promised 30 Nov 2027

  • Prestige Sanctuary

    VILLAGE DE NANDI PVT LTD · Devanahalli, Bengaluru Rural · Residential/Group Housing

    85 of 85 homes booked · 100% built · 100% of the promised time used · Q1 2026-27 filing · completion promised 31 May 2026

  • Raagam Phase-1

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 576 plots booked · 94% developed · 83% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Raagam Phase-II

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 7 plots booked · 20% developed · 47% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2028

  • Sattva Aeropolis Phase 2

    TRINAYANI REALTORS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    329 of 554 homes booked · 33% built · 25% of the promised time used · Q1 2026-27 filing · completion promised 16 Oct 2028

  • Sattva Bhumi

    SHIRASA CONSTRUCTION PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    332 of 343 plots booked · 100% developed · 77% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2026

  • Sattva Vasanta Cove

    Sattva Resi Private Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    71 of 200 homes booked · 9% built · 11% of the promised time used · Q1 2026-27 filing · completion promised 27 Dec 2030

  • Sattva Vasanta Skye

    Sattva Resi Private Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    21 of 56 homes booked · 14% built · 19% of the promised time used · Q1 2026-27 filing · completion promised 6 May 2031

  • Shantivan

    SIDHARTH MADHUBAN · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 80 plots booked · 35% developed · 29% of the promised time used · Q1 2026-27 filing · completion promised 31 Oct 2028

  • Sobha Oakshire Phase 1 Wing 1,2,7 and 8

    SOBHA LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    30 of 30 homes booked · 100% built · 87% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Sobha Oakshire Phase 2 Wing 3,4,9 and 10

    SOBHA LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    30 of 30 homes booked · 90% built · 77% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2027

  • Sobha Oakshire Phase 3 Wing 5,6,11 and 12

    SOBHA LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    20 of 20 homes booked · 90% built · 68% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Sumadhura Panorama Phase-I

    SUMADHURA REALTY · Devanahalli, Bengaluru Rural · Plotted Development

    414 of 539 plots booked · 90% developed · 49% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Sumadhura Panorama Phase-II

    SUMADHUARA EMPIRE ESTATES PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 443 plots booked · 59% developed · 3% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Summer Skies

    Reddy Veeranna Construction Private Limited · Devanahalli, Bengaluru Rural · Plotted Development

    1 of 117 plots booked · 30% developed · 6% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Summers At Orchid Nirvana

    MANGO DEVELOPERS · Devanahalli, Bengaluru Rural · Plotted Development

    504 of 504 plots booked · 10% developed · 5% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2031

  • Surya Serene Skyline

    Surya Serene Skyline · Devanahalli, Bengaluru Rural · Residential/Group Housing

    17 of 117 homes booked · 43% built · 31% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Tangled Up In Green

    TANGLED UP IN GREEN PROPERTIES PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    972 of 972 plots booked · 38% developed · 50% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • The Landmark

    KADIRI VENKATA NARASIMHA REDDY · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 99 plots booked · 20% developed · 5% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2031

  • The Midsummer Rain-Villa Plot Development Phase 4

    AXIS CAPSTONE REALTY LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 28 plots booked · 3% developed · 28% of the promised time used · Q1 2026-27 filing · completion promised 30 Apr 2029

  • The Roots

    SRK INFRA PROJECTS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Residential/Group Housing

    28 of 100 homes booked · 24% built · 16% of the promised time used · Q1 2026-27 filing · completion promised 30 Jul 2030

  • The Secret Lake

    EQUINOX GLOBAL SHELTERS · Devanahalli, Bengaluru Rural · Plotted Development

    431 of 701 plots booked · 68% developed · 25% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2030

  • Vaishnavi At-One Life IV

    VAISHNAVI AT-ONE LIFE PARK LLP and AT-ONE ESTATES PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    2 of 227 plots booked · 65% developed · 8% of the promised time used · Q1 2026-27 filing · completion promised 18 Dec 2027

  • Varnam Phase 1a

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    48 of 48 homes booked · 10% built · 17% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2030

  • Varnam Phase 1B

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    249 of 285 homes booked · 9% built · 17% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2030

  • Varnam Phase 1C

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    262 of 298 homes booked · 9% built · 16% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2031

  • Varnam Phase 1D

    ONE BANGALORE LUXURY PROJECTS LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    135 of 211 homes booked · 7% built · 9% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2031

  • White Lotus Amanvana

    WHITE LOTUS ALLIED HOMES LLP · Devanahalli, Bengaluru Rural · Residential/Group Housing

    10 of 95 homes booked · 15% built · 16% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Provident Deansgate

    Puravankara Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    130 of 147 homes booked · 76% built · 67% of the promised time used · Q4 2025-26 filing · completion promised 31 May 2027

  • Provident Deansgate Phase 2

    Puravankara Limited · Devanahalli, Bengaluru Rural · Residential/Group Housing

    84 of 141 homes booked · 24% built · 34% of the promised time used · Q4 2025-26 filing · completion promised 31 Mar 2028

  • Signature One

    THEME AMBIENCE ROI PROJECTS PRIVATE LIMITED · Devanahalli, Bengaluru Rural · Plotted Development

    21 of 129 plots booked · 100% developed · 33% of the promised time used · Q4 2025-26 filing · completion promised 31 Mar 2030

  • Swaram Phase-2

    One Bangalore Luxury Projects LLP · Devanahalli, Bengaluru Rural · Plotted Development

    23 of 23 plots booked · 100% developed · 100% of the promised time used · Q4 2025-26 filing · completion promised 31 Mar 2026

  • The Midsummer Rain-Villa Plot Development Phase 3

    AXIS CAPSTONE REALTY LLP · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 43 plots booked · 100% developed · 43% of the promised time used · Q4 2025-26 filing · completion promised 30 Apr 2028

  • Earth Aroma Phase-2

    Parisara Builders and Developers · Devanahalli, Bengaluru Rural · Plotted Development

    78 of 78 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Earthsong BY Manyata Phase-5C

    Square plots Private limited · Devanahalli, Bengaluru Rural · Plotted Development

    57 of 62 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Elite Park Phase 4

    Elite Estates · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 105 plots booked · 100% developed · 18% of the promised time used · Q3 2025-26 filing · completion promised 2 May 2026

  • Elite Rose Phase 2

    Elite Estates · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 70 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Elite Rose Phase 3

    Elite Estates · Devanahalli, Bengaluru Rural · Plotted Development

    0 of 35 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Northern Boulevard

    Nimishamba Developers · Devanahalli, Bengaluru Rural · Plotted Development

    78 of 269 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Pearl at Brigade Atmosphere

    Brigade Enterprises Ltd · Devanahalli, Bengaluru Rural · Residential/Group Housing

    132 of 132 homes booked · 100% built · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Rare Earth Athena

    Rarearth Athena · Devanahalli, Bengaluru Rural · Plotted Development

    7 of 80 plots booked · 80% developed · 3% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2026

Hosakote · 92 projects

  • SLN Nidhi Aura

    SLN INFRA · Hosakote, Bengaluru Rural · Plotted Development

    0 of 88 plots booked · 80% developed · 48% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • 96 Brick wood Avenue

    Cinoti ventures LLP · Hosakote, Bengaluru Rural · Residential/Group Housing

    0 of 48 homes booked · 8% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 16 May 2031

  • Aakriti Emerald

    AAKRITI PROJECTS · Hosakote, Bengaluru Rural · Residential/Group Housing

    27 of 130 homes booked · 33% built · 27% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2028

  • Adarsh Paradise

    A1 BUILDERS · Hosakote, Bengaluru Rural · Residential/Group Housing

    85 of 238 homes booked · 87% built · 85% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Adithya Paradise -5

    PARADISE HOMES · Hosakote, Bengaluru Rural · Plotted Development

    61 of 156 plots booked · 100% developed · 50% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2027

  • Agm Builders

    AGM BUILDERS · Hosakote, Bengaluru Rural · Plotted Development

    0 of 28 plots booked · 100% developed · 14% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Alcor

    NAGARJUNA STRUCTURAL CORPORATION PRIVATE LIMITED · Hosakote, Bengaluru Rural · Plotted Development

    0 of 71 plots booked · 50% developed · 5% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Anahata

    ISHTIKA VIBRANIUM DEVELOPERS LLP · Hosakote, Bengaluru Rural · Residential/Group Housing

    118 of 259 homes booked · 30% built · 30% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2029

  • Anahata Phase - 2

    ISHTIKA VIBRANIUM DEVELOPERS LLP · Hosakote, Bengaluru Rural · Residential/Group Housing

    82 of 181 homes booked · 20% built · 24% of the promised time used · Q1 2026-27 filing · completion promised 31 Jul 2029

  • Anthill Silverfields

    Anthill Projects LLP · Hosakote, Bengaluru Rural · Plotted Development

    7 of 211 plots booked · 65% developed · 59% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Ar Belle Vie Phase 1

    S & S PROPERTIES and JMD Developers · Hosakote, Bengaluru Rural · Residential/Group Housing

    9 of 222 homes booked · 10% built · 8% of the promised time used · Q1 2026-27 filing · completion promised 5 Feb 2029

  • Arya’s Avadana

    ARYAVARIDHI PROJECTS · Hosakote, Bengaluru Rural · Residential/Group Housing

    9 of 64 homes booked · 31% built · 15% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Bhuvana Boulevard Phase 1

    VSPR DEVELOPERS · Hosakote, Bengaluru Rural · Residential/Group Housing

    1 of 28 homes booked · 11% built · 21% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Bhuvana Boulevard Phase 2

    VSPR DEVELOPERS · Hosakote, Bengaluru Rural · Residential/Group Housing

    4 of 28 homes booked · 10% built · 21% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Bold Aspire

    Bold Developers · Hosakote, Bengaluru Rural · Residential/Group Housing

    49 of 162 homes booked · 70% built · 78% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Brigade Citrine

    Brigade Enterprises Ltd · Hosakote, Bengaluru Rural · Residential/Group Housing

    404 of 420 homes booked · 38% built · 34% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2029

  • Carpe Diem

    VIJAYASRI VIJETHA INFRA PROJECTS · Hosakote, Bengaluru Rural · Plotted Development

    10 of 125 plots booked · 75% developed · 43% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Daiwik Sayuri

    DAIWIK SHELTERS PRIVATE LIMITED · Hosakote, Bengaluru Rural · Plotted Development

    0 of 211 plots booked · 95% developed · 72% of the promised time used · Q1 2026-27 filing · completion promised 1 Dec 2026

  • DR Elita

    DR Infra · Hosakote, Bengaluru Rural · Plotted Development

    0 of 74 plots booked · 85% developed · 22% of the promised time used · Q1 2026-27 filing · completion promised 31 Jan 2028

  • DS Max SKY Fields

    DS Max Properties Private Limited · Hosakote, Bengaluru Rural · Residential/Group Housing

    239 of 870 homes booked · 31% built · 28% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2030

  • DS Max SKY Samurai

    DS-MAX PROPERTIES PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    162 of 285 homes booked · 98% built · 49% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • East Field

    URBANEST REALTY · Hosakote, Bengaluru Rural · Residential/Group Housing

    68 of 200 homes booked · 33% built · 31% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Eeshanya Aaroha

    EESHANYA INFRA LLP · Hosakote, Bengaluru Rural · Residential/Group Housing

    36 of 120 homes booked · 40% built · 29% of the promised time used · Q1 2026-27 filing · completion promised 31 May 2028

  • Garuda Park View

    GARUDA CONSTRUCTIONS · Hosakote, Bengaluru Rural · Residential/Group Housing

    15 of 90 homes booked · 16% built · 13% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2029

  • Godrej Parkshire

    Godrej Properties Limited · Hosakote, Bengaluru Rural · Residential/Group Housing

    594 of 1132 homes booked · 3% built · 9% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2030

  • Godrej Woodland

    Godrej Properties Ltd · Hosakote, Bengaluru Rural · Plotted Development

    900 of 900 plots booked · 88% developed · 91% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Godrej Woodland Phase 2

    Godrej Properties Limited · Hosakote, Bengaluru Rural · Plotted Development

    125 of 125 plots booked · 88% developed · 88% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Green Park

    SSV DEVELOPERS · Hosakote, Bengaluru Rural · Residential/Group Housing

    45 of 208 homes booked · 20% built · 12% of the promised time used · Q1 2026-27 filing · completion promised 20 Nov 2029

  • Irise

    M/s. Upstate United · Hosakote, Bengaluru Rural · Plotted Development

    0 of 166 plots booked · 80% developed · 20% of the promised time used · Q1 2026-27 filing · completion promised 15 Jan 2029

  • Isha Hilife

    ISHA CORP · Hosakote, Bengaluru Rural · Residential/Group Housing

    131 of 199 homes booked · 95% built · 81% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • JB Vision

    G Babu · Hosakote, Bengaluru Rural · Plotted Development

    10 of 155 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • JP Hibiscus

    JPHC PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    31 of 76 homes booked · 53% built · 50% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • JP Iris Block-A

    JP Housing Corporation · Hosakote, Bengaluru Rural · Residential/Group Housing

    23 of 92 homes booked · 48% built · 21% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • JP Iris Block-B

    JP Housing Corporation · Hosakote, Bengaluru Rural · Residential/Group Housing

    28 of 88 homes booked · 36% built · 14% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • JP Jasmine

    JPHC PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    4 of 66 homes booked · 32% built · 14% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • JP Lavender Block-A

    JP Housing Corporation · Hosakote, Bengaluru Rural · Residential/Group Housing

    30 of 76 homes booked · 71% built · 81% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • JP Lavender Block-B

    JP Housing Corporation · Hosakote, Bengaluru Rural · Residential/Group Housing

    9 of 24 homes booked · 67% built · 81% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • JR One East

    JR Housing Developers Pvt Ltd · Hosakote, Bengaluru Rural · Plotted Development

    21 of 177 plots booked · 95% developed · 39% of the promised time used · Q1 2026-27 filing · completion promised 30 Nov 2028

  • KBR Prime

    KBR HOMES INDIA PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    2 of 124 homes booked · 95% built · 39% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2029

  • Kumari Nautilus

    KUMARI INFRA HOMES PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    114 of 165 homes booked · 85% built · 66% of the promised time used · Q1 2026-27 filing · completion promised 12 Jan 2028

  • Leafy Delight

    LEAFY REALTY LLP · Hosakote, Bengaluru Rural · Residential/Group Housing

    12 of 67 homes booked · 55% built · 32% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2028

  • M1 Terra Alegria Phase 2

    M1 HOUSING LLP · Hosakote, Bengaluru Rural · Plotted Development

    223 of 224 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • Mizar

    NAGARJUNA STRUCTURAL CORPORATION PRIVATE LIMITED · Hosakote, Bengaluru Rural · Plotted Development

    0 of 44 plots booked · 50% developed · 4% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Nexon Celestials

    NEXON BUILDERS AND DEVELOPERS · Hosakote, Bengaluru Rural · Plotted Development

    0 of 76 plots booked · 95% developed · 17% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Nexon Travenza

    NEXON Developers · Hosakote, Bengaluru Rural · Plotted Development

    2 of 36 plots booked · 45% developed · 10% of the promised time used · Q1 2026-27 filing · completion promised 25 Aug 2031

  • Nexon Travenza

    NEXON BUILDERS · Hosakote, Bengaluru Rural · Plotted Development

    2 of 83 plots booked · 29% developed · 12% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2031

  • One Residences At Sobha One World Ph1 W1 and 2

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    150 of 542 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 31 Jul 2032

  • One Residences At Sobha One World Ph2 W3 and 4

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    0 of 530 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 30 Nov 2032

  • One Residences At Sobha One World Ph3 W5 and 6

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    0 of 530 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2033

  • One Residences At Sobha One World Ph4 W7 and 8

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    74 of 440 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2033

  • One Residences At Sobha One World Ph5 W9,10,11

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    345 of 721 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 28 Feb 2033

  • One Residences At Sobha One World Ph6 W12,13,14

    SOBHA LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    315 of 721 homes booked · 0% built · 2% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2032

  • Ridhi Vivanta

    M/S. RIDHI VIVANTA · Hosakote, Bengaluru Rural · Plotted Development

    0 of 145 plots booked · 100% developed · 41% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Rings Avenue

    VARASINDURI PROPERTIES · Hosakote, Bengaluru Rural · Residential/Group Housing

    58 of 144 homes booked · 55% built · 31% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2029

  • Riqueza Siri

    Riqueza Estates Private Limited · Hosakote, Bengaluru Rural · Residential/Group Housing

    59 of 128 homes booked · 87% built · 67% of the promised time used · Q1 2026-27 filing · completion promised 30 Nov 2027

  • Riviera Uno

    NIRVANA DEVELOPERS · Hosakote, Bengaluru Rural · Residential/Group Housing

    109 of 137 homes booked · 60% built · 28% of the promised time used · Q1 2026-27 filing · completion promised 31 Jan 2030

  • Saritha Santorini

    Saritha Developers · Hosakote, Bengaluru Rural · Residential/Group Housing

    0 of 1 homes booked · 15% built · 28% of the promised time used · Q1 2026-27 filing · completion promised 30 Apr 2029

  • Shubha Nivas

    M/S. JAGATI INFRA · Hosakote, Bengaluru Rural · Residential/Group Housing

    39 of 72 homes booked · 97% built · 87% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Sidvin Serenity

    SIDVIN URBAN DEVELOPERS · Hosakote, Bengaluru Rural · Plotted Development

    70 of 165 plots booked · 32% developed · 29% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Silver Stream

    ARK GLOBAL ESTATES · Hosakote, Bengaluru Rural · Plotted Development

    0 of 74 plots booked · 100% developed · 11% of the promised time used · Q1 2026-27 filing · completion promised 12 Sept 2028

  • Sisira Park

    SREEHAN INFRACON (OPC) PRIVATE LIMITED · Hosakote, Bengaluru Rural · Plotted Development

    0 of 78 plots booked · 15% developed · 4% of the promised time used · Q1 2026-27 filing · completion promised 22 Jan 2030

  • SJ Park Ville

    SJ CONSTRUCTIONS · Hosakote, Bengaluru Rural · Residential/Group Housing

    6 of 118 homes booked · 9% built · 7% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Sowparnika Euphoria In The East

    SOWPARNIKA HOMES PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    1083 of 1102 homes booked · 50% built · 28% of the promised time used · Q1 2026-27 filing · completion promised 31 May 2031

  • Sowparnika Indradhanush Phase II

    SOWPARNIKA HOMES PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    357 of 360 homes booked · 98% built · 71% of the promised time used · Q1 2026-27 filing · completion promised 30 Nov 2027

  • Sowparnika Rhythm of Rain

    SOWPARNIKA HOMES PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    675 of 725 homes booked · 34% built · 20% of the promised time used · Q1 2026-27 filing · completion promised 15 Jan 2032

  • Sowparnika Whispering Petals

    SOWPARNIKA GREEN MEADOWS PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    698 of 762 homes booked · 18% built · 10% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2032

  • Svanta

    Akkruthi Livespaces LLP · Hosakote, Bengaluru Rural · Plotted Development

    259 of 259 plots booked · 17% developed · 23% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Tapasya

    Keisha Projects Private Limited · Hosakote, Bengaluru Rural · Plotted Development

    0 of 80 plots booked · 36% developed · 25% of the promised time used · Q1 2026-27 filing · completion promised 30 Jul 2027

  • Tattvam

    Yellow Stone Developers · Hosakote, Bengaluru Rural · Plotted Development

    12 of 240 plots booked · 70% developed · 52% of the promised time used · Q1 2026-27 filing · completion promised 30 May 2027

  • The Berries for Birds by Sanjeevini Srushti

    SANJEEVINI SRUSHTI PROPERTIES · Hosakote, Bengaluru Rural · Plotted Development

    6 of 277 plots booked · 28% developed · 46% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2027

  • Triaxis Splendour +

    M s Triaxis Infra Projects · Hosakote, Bengaluru Rural · Residential/Group Housing

    58 of 104 homes booked · 94% built · 91% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Trivik Signature

    TRIVIK SIGNATURE · Hosakote, Bengaluru Rural · Residential/Group Housing

    13 of 408 homes booked · 13% built · 6% of the promised time used · Q1 2026-27 filing · completion promised 26 Dec 2031

  • United Green Woods

    UNITED GREEN WOODS · Hosakote, Bengaluru Rural · Residential/Group Housing

    183 of 282 homes booked · 54% built · 49% of the promised time used · Q1 2026-27 filing · completion promised 16 Mar 2028

  • United Suvarna Homes

    UNITED SUVARNA HOMES · Hosakote, Bengaluru Rural · Residential/Group Housing

    0 of 156 homes booked · 25% built · 18% of the promised time used · Q1 2026-27 filing · completion promised 8 Sept 2029

  • V.R Mega Township

    VR VENTURES · Hosakote, Bengaluru Rural · Plotted Development

    11 of 192 plots booked · 17% developed · 39% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • VR Dyavaiah Enclave

    VR REALTY · Hosakote, Bengaluru Rural · Plotted Development

    0 of 50 plots booked · 7% developed · 9% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2028

  • VR Royal Township

    VR BUILDERS AND DEVELOPERS · Hosakote, Bengaluru Rural · Plotted Development

    115 of 385 plots booked · 57% developed · 78% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • VR Sapphire

    VR Builders And Developers · Hosakote, Bengaluru Rural · Residential/Group Housing

    24 of 46 homes booked · 60% built · 78% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2026

  • Whispers Of Bliss

    VENKATESWARA CREATORS · Hosakote, Bengaluru Rural · Residential/Group Housing

    1 of 12 homes booked · 60% built · 68% of the promised time used · Q1 2026-27 filing · completion promised 15 Dec 2026

  • Adithya Homes Paradise Phase-4

    ADITHYA HOMES · Hosakote, Bengaluru Rural · Plotted Development

    16 of 86 plots booked · 100% developed · 76% of the promised time used · Q4 2025-26 filing · completion promised 22 Jun 2026

  • Elements Of Nature Happy Hive

    URBAN FIELDS REALTY LLP · Hosakote, Bengaluru Rural · Plotted Development

    149 of 150 plots booked · 100% developed · 53% of the promised time used · Q4 2025-26 filing · completion promised 9 Aug 2027

  • Sidvin Symphony

    AVYANHP SHARAYU · Hosakote, Bengaluru Rural · Plotted Development

    51 of 157 plots booked · 100% developed · 100% of the promised time used · Q4 2025-26 filing · completion promised 31 Mar 2026

  • Bodhii Tree

    VAISHNAVI RESIDENCES · Hosakote, Bengaluru Rural · Plotted Development

    18 of 109 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 30 Dec 2025

  • Gold Star Layout

    A IQBAL KHAN · Hosakote, Bengaluru Rural · Plotted Development

    0 of 138 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • JR Eastfields

    JR HOUSING DEVELOPERS PVT LTD · Hosakote, Bengaluru Rural · Plotted Development

    103 of 389 plots booked · 100% developed · 79% of the promised time used · Q3 2025-26 filing · completion promised 1 Aug 2026

  • JR STRR Enclave

    JR Housing Developers Pvt Ltd · Hosakote, Bengaluru Rural · Plotted Development

    8 of 33 plots booked · 100% developed · 90% of the promised time used · Q3 2025-26 filing · completion promised 11 Apr 2026

  • Mattania Serenity

    MATTANIA INFRATECH PRIVATE LIMITED · Hosakote, Bengaluru Rural · Plotted Development

    0 of 44 plots booked · 100% developed · 87% of the promised time used · Q3 2025-26 filing · completion promised 23 Feb 2026

  • Mithila Splendor

    SRI JAGATI PROPERTIES · Hosakote, Bengaluru Rural · Residential/Group Housing

    87 of 164 homes booked · 90% built · 70% of the promised time used · Q3 2025-26 filing · completion promised 31 Oct 2026

  • Orion Enclave

    ORION REALTORS · Hosakote, Bengaluru Rural · Plotted Development

    74 of 83 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 30 Dec 2025

  • Provident Botanico

    Provident Housing Limited · Hosakote, Bengaluru Rural · Residential/Group Housing

    141 of 148 homes booked · 34% built · 39% of the promised time used · Q3 2025-26 filing · completion promised 30 Sept 2028

  • Sapthagiri Sampadha

    Sapthagiri Constructions · Hosakote, Bengaluru Rural · Residential/Group Housing

    42 of 96 homes booked · 100% built · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Sowparnika Ashiyana Phase II

    SOWPARNIKA PROJECTS AND INFRASTRUCTURE PRIVATE LIMITED · Hosakote, Bengaluru Rural · Residential/Group Housing

    419 of 422 homes booked · 100% built · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

Doddaballapura · 16 projects

  • 99D BY Santhusta

    M/s. SANTHUSTA INFRACON PRIVATE LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    15 of 99 plots booked · 72% developed · 30% of the promised time used · Q1 2026-27 filing · completion promised 31 Jul 2028

  • Aamaya

    SRK INFRA PROJECTS PRIVATE LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    0 of 18 plots booked · 0% developed · 8% of the promised time used · Q1 2026-27 filing · completion promised 31 Jan 2029

  • Aravya Estate

    GODREJ TOWNSHIP DEVELOPMENT LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    669 of 669 plots booked · 54% developed · 14% of the promised time used · Q1 2026-27 filing · completion promised 31 Oct 2030

  • Century Bliss

    Hebbal Properties Private Limited · Doddaballapura, Bengaluru Rural · Residential/Group Housing

    29 of 272 homes booked · 3% built · 4% of the promised time used · Q1 2026-27 filing · completion promised 7 Apr 2031

  • DS Max SKY Sisira

    DS Max Properties Private Limited · Doddaballapura, Bengaluru Rural · Residential/Group Housing

    252 of 870 homes booked · 42% built · 28% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2030

  • KNS Candrill

    KNS EQUITY ESTATES LLP · Doddaballapura, Bengaluru Rural · Plotted Development

    350 of 452 plots booked · 92% developed · 38% of the promised time used · Q1 2026-27 filing · completion promised 15 Jun 2029

  • Lagos

    B&M HOMES · Doddaballapura, Bengaluru Rural · Plotted Development

    231 of 298 plots booked · 66% developed · 61% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Make Borough

    IRON KORE PRIVATE LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    24 of 35 plots booked · 100% developed · 66% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Nexfield

    SIDDHATVA DEVELOPERS PRIVATE LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    0 of 142 plots booked · 91% developed · 34% of the promised time used · Q1 2026-27 filing · completion promised 25 Nov 2027

  • Northwinds by Geown & Nivara

    GEOWN CASPER ESTATES LLP & Nivara Group · Doddaballapura, Bengaluru Rural · Plotted Development

    43 of 126 plots booked · 87% developed · 26% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Rewild Doddaballapura

    Rewild Life LLP · Doddaballapura, Bengaluru Rural · Plotted Development

    114 of 141 plots booked · 64% developed · 42% of the promised time used · Q1 2026-27 filing · completion promised 13 Jun 2029

  • Shriram Pristine Estates

    SPL HOUSING PROJECTS PRIVATE LIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    513 of 513 plots booked · 100% developed · 100% of the promised time used · Q1 2026-27 filing · completion promised 15 May 2026

  • The Silver Lake Phase 1

    HARINATHA REDDY · Doddaballapura, Bengaluru Rural · Plotted Development

    101 of 101 plots booked · 97% developed · 48% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2026

  • Whispers of the Wind

    Sree Holdings · Doddaballapura, Bengaluru Rural · Plotted Development

    23 of 207 plots booked · 31% developed · 25% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • The Earth

    SRK INFRA PROJECTS PRIVATELIMITED · Doddaballapura, Bengaluru Rural · Plotted Development

    328 of 440 plots booked · 98% developed · 94% of the promised time used · Q4 2025-26 filing · completion promised 31 May 2026

  • KBL Enclave - Phase 2

    L KUMAR · Doddaballapura, Bengaluru Rural · Plotted Development

    26 of 77 plots booked · 100% developed · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

Nelamangala · 11 projects

Ramanagara · 1 project

  • Rock Hills

    FIDELIS RAMNAGARA · Ramanagara, Bengaluru Rural · Plotted Development

    10 of 49 plots booked · 100% developed · 89% of the promised time used · Q3 2025-26 filing · completion promised 30 Sept 2026

Builders in Bengaluru Rural