New projects in Belagavi

Every project in Belagavi that files its sales and construction with Karnataka RERA, as filed.

Brokers: this week’s stock sheet for Belagavi →

Booked so far

1710 of 4064

Across 87 projects, at each one's latest filing.

Booked in Q2 2026-27

211

By the 40 projects that filed both of the last two quarters; 18 of them booked none.

Belagavi · 79 projects

  • Adarsh Homes

    D & K Associates · Belagavi · Residential/Group Housing

    18 of 42 homes booked · 77% built · 47% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2028

  • Ambica Orchid

    M/S. ABHIJEET ARVIND JAWALKAR · Belagavi · Residential/Group Housing

    2 of 10 homes booked · 20% built · 20% of the promised time used · Q2 2026-27 filing · completion promised 30 Sept 2028

  • Anand

    SHARAD SHRINIVAS PAI · Belagavi · Residential/Group Housing

    2 of 7 homes booked · 40% built · 62% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • Audumbar Residency

    M/s. Bramha Construction · Belagavi · Residential/Group Housing

    7 of 16 homes booked · 93% built · 23% of the promised time used · Q2 2026-27 filing · completion promised 15 Sept 2029

  • Avadhoot Chaya

    SHRI DATTAAVADHOOT DEVELOPERS LLP · Belagavi · Residential/Group Housing

    11 of 22 homes booked · 80% built · 36% of the promised time used · Q2 2026-27 filing · completion promised 20 Apr 2028

  • Bliss Residency

    Kirti Pramod Nerlekar · Belagavi · Mixed Development

    0 of 12 homes booked · 65% built · 26% of the promised time used · Q2 2026-27 filing · completion promised 5 Mar 2028

  • CCare Blossom

    CGK CONSTRUCTIONS AND REAL ESTATE PRIVATE LIMITED · Belagavi · Residential/Group Housing

    5 of 13 homes booked · 71% built · 66% of the promised time used · Q2 2026-27 filing · completion promised 28 Aug 2027

  • Chirayu Residency

    CHIRAYU BUILDERS · Belagavi · Residential/Group Housing

    19 of 44 homes booked · 100% built · 83% of the promised time used · Q2 2026-27 filing · completion promised 30 Mar 2027

  • De-Prudent

    MANJUNATH B GARAG INFRACON PRIVATE LIMITED · Belagavi · Mixed Development

    0 of 10 homes booked · 85% built · 40% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2028

  • Gourinandan Arcade

    GOURINANDAN BUILDCON · Belagavi · Mixed Development

    8 of 20 homes booked · 91% built · 34% of the promised time used · Q2 2026-27 filing · completion promised 20 Jul 2029

  • Harsh Residency

    SIDDHAYANI CONSTRUCTIONS PRIVATE LIMITED · Belagavi · Residential/Group Housing

    1 of 10 homes booked · 100% built · 50% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • Kapstone Crest

    K P INFRA VENTURES · Belagavi · Residential/Group Housing

    8 of 40 homes booked · 47% built · 32% of the promised time used · Q2 2026-27 filing · completion promised 14 Sept 2028

  • Laxmi Keshav Apartments

    NIMBUS INFRA · Belagavi · Residential/Group Housing

    0 of 21 homes booked · 80% built · 49% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • Meera Resides

    CGK CONSTRUCTION AND REAL ESTATE PRIVATE LIMITED · Belagavi · Residential/Group Housing

    39 of 39 homes booked · 100% built · 74% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • Monarch BY Heda Luxury

    SHRI SHYAM BUILDERS · Belagavi · Residential/Group Housing

    3 of 8 homes booked · 84% built · 45% of the promised time used · Q2 2026-27 filing · completion promised 25 Apr 2028

  • Morya Legacy

    PARTH INFRA · Belagavi · Residential/Group Housing

    5 of 14 homes booked · 66% built · 19% of the promised time used · Q2 2026-27 filing · completion promised 30 Apr 2029

  • Morya Tranquil

    PARTH BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    4 of 29 homes booked · 35% built · 15% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2029

  • Naik Tower

    SHIVALAYA CONSTRUCTIONS · Belagavi · Commercial

    0 of 57 homes booked · 80% built · 15% of the promised time used · Q2 2026-27 filing · completion promised 30 Sept 2028

  • Navchaitnya Elite

    NAVCHAITANYA DEVELOPERS · Belagavi · Residential/Group Housing

    2 of 35 homes booked · 64% built · 25% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2028

  • One Life Phase I & II

    Ambica Infra Build · Belagavi · Residential/Group Housing

    2 of 80 homes booked · 40% built · 44% of the promised time used · Q2 2026-27 filing · completion promised 30 Aug 2027

  • One Life Phase III ,iv & V

    Ambica Infra Build · Belagavi · Residential/Group Housing

    0 of 102 homes booked · 10% built · 15% of the promised time used · Q2 2026-27 filing · completion promised 25 Jul 2030

  • Parijat

    D & K ASSOCIATES · Belagavi · Residential/Group Housing

    14 of 16 homes booked · 97% built · 62% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • Shivneri Apartment

    SHIVNERI CONSTRUCTIONS · Belagavi · Mixed Development

    104 of 104 homes booked · 45% built · 9% of the promised time used · Q2 2026-27 filing · completion promised 30 Jul 2030

  • Shivneri Empire Shrivnsh

    SHIVNERI EMPIRE · Belagavi · Residential/Group Housing

    3 of 15 homes booked · 72% built · 60% of the promised time used · Q2 2026-27 filing · completion promised 30 Aug 2027

  • Shree Mahalaxmi Residency

    SHREE MANGESH CONSTRUCTIONS PROP. JAYANT SHANAK TILVE · Belagavi · Residential/Group Housing

    9 of 16 homes booked · 100% built · 61% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2027

  • Shree Swami Krupa

    PANARE BUILDERS & DEVELOEPRS · Belagavi · Mixed Development

    3 of 13 homes booked · 74% built · 52% of the promised time used · Q2 2026-27 filing · completion promised 10 Apr 2028

  • Shri Kamakshi Residency

    OMSAI BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    0 of 12 homes booked · 41% built · 59% of the promised time used · Q2 2026-27 filing · completion promised 30 Aug 2027

  • Silver Shine

    SILVER SHINE BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    25 of 25 homes booked · 45% built · 28% of the promised time used · Q2 2026-27 filing · completion promised 30 Jun 2029

  • Siri Hari Crest

    SIRI BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    0 of 13 homes booked · 25% built · 6% of the promised time used · Q2 2026-27 filing · completion promised 30 Sept 2029

  • SSR Divine

    M/s SSR DEVELOPERS · Belagavi · Residential/Group Housing

    11 of 19 homes booked · 73% built · 84% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • Swaraj Pride

    BELGAUM INFRA BUILD · Belagavi · Mixed Development

    8 of 38 homes booked · 78% built · 44% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2028

  • Swarna Griha - 4 Phase 2

    FELICITY ADOBE LLP · Belagavi · Residential/Group Housing

    416 of 520 homes booked · 81% built · 72% of the promised time used · Q2 2026-27 filing · completion promised 31 Oct 2027

  • The Olive Pearl

    MANGALMURTI HOMES · Belagavi · Residential/Group Housing

    5 of 12 homes booked · 40% built · 10% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2029

  • The Strand

    THE STRAND CONSTRUCTIONS · Belagavi · Residential/Group Housing

    16 of 20 homes booked · 87% built · 83% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2027

  • Tulsi

    ARADHANA BUILDERS · Belagavi · Residential/Group Housing

    3 of 14 homes booked · 100% built · 39% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2028

  • Unity Heights

    TARADE BROTHERS INFRASTRUCTURE PRIVATE LIMITED · Belagavi · Residential/Group Housing

    13 of 24 homes booked · 98% built · 45% of the promised time used · Q2 2026-27 filing · completion promised 23 Apr 2028

  • Vaishnavii Residency I

    Veerbhadrappa Ghativalappa Kivadasannavar Prop. Vaishnavii Developers · Belagavi · Residential/Group Housing

    9 of 16 homes booked · 83% built · 80% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2027

  • Vaishnavii Residency II

    VEERBHADRAPPA GHATIVALAPPA KIVADASNNAVAR PROP. VAISHNAVII DEVELOPERS · Belagavi · Residential/Group Housing

    9 of 16 homes booked · 83% built · 80% of the promised time used · Q2 2026-27 filing · completion promised 31 Mar 2027

  • Viva Aspire

    VIVA INFRA VENTURES · Belagavi · Residential/Group Housing

    23 of 30 homes booked · 100% built · 53% of the promised time used · Q2 2026-27 filing · completion promised 30 Jun 2028

  • Amar Infinity

    AMAR YALLAPPA AKANOJI · Belagavi · Residential/Group Housing

    23 of 30 homes booked · 100% built · 29% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2029

  • Arvindum Residency

    SHASHI DEVELOPERS · Belagavi · Residential/Group Housing

    4 of 12 homes booked · 100% built · 100% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2025

  • Hanamanta Krupa

    VELMAVIRASHRI NIRMITI · Belagavi · Residential/Group Housing

    1 of 12 homes booked · 72% built · 49% of the promised time used · Q1 2026-27 filing · completion promised 31 Mar 2027

  • Kriiya Nests

    IRADITI CONSTRUCTION PRIVATE LIMITED · Belagavi · Residential/Group Housing

    6 of 12 homes booked · 75% built · 100% of the promised time used · Q1 2026-27 filing · completion promised 29 May 2026

  • Krrish Vrindavan

    GOPALRAO TUKARAM KUKDOLKAR · Belagavi · Mixed Development

    0 of 36 homes booked · 46% built · 30% of the promised time used · Q1 2026-27 filing · completion promised 9 Sept 2027

  • Morya Elite

    PARTH BUILDERS AND DEVELOPERS · Belagavi · Mixed Development

    14 of 19 homes booked · 100% built · 59% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Orionis Opal

    M/s. VARDHAMAN VENTURES · Belagavi · Mixed Development

    49 of 100 homes booked · 42% built · 12% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2028

  • Orionis Propus

    M/s. VARDHAMAN VENTURES · Belagavi · Mixed Development

    17 of 17 homes booked · 100% built · 53% of the promised time used · Q1 2026-27 filing · completion promised 31 Dec 2027

  • Ruby Pride

    VEETRAG VENTURES · Belagavi · Mixed Development

    12 of 17 homes booked · 100% built · 54% of the promised time used · Q1 2026-27 filing · completion promised 30 Dec 2027

  • Sairaj Enclave

    SAIRAJ BUILDERS · Belagavi · Residential/Group Housing

    9 of 19 homes booked · 100% built · 91% of the promised time used · Q1 2026-27 filing · completion promised 31 Aug 2026

  • Shree Swami Samarth Shiv Residency

    AADISHAKTI CONSTRUCTION COMPANY · Belagavi · Residential/Group Housing

    2 of 12 homes booked · 84% built · 49% of the promised time used · Q1 2026-27 filing · completion promised 30 Sept 2027

  • Sunshine Avenue

    Sunshine Developers Prop Raaz Mohammed Abdulsamad Pathan · Belagavi · Residential/Group Housing

    23 of 45 homes booked · 100% built · 100% of the promised time used · Q1 2026-27 filing · completion promised 30 Jun 2026

  • Hari Nikhunj

    VATSALA CONSTRUCTIONS MADAN D DESHPANDE HUF · Belagavi · Mixed Development

    17 of 17 homes booked · 100% built · 75% of the promised time used · Q4 2025-26 filing · completion promised 31 Dec 2026

  • Heda Arcade

    VIJAYKUMAR RATANLAL HEDA PROP OF VIJAY ENTERPRISES · Belagavi · Commercial

    11 of 22 homes booked · 100% built · 55% of the promised time used · Q4 2025-26 filing · completion promised 30 Sept 2027

  • Jyoti Abhishek Residency Phase 3

    BHASKAR RAMGONDA PATIL · Belagavi · Residential/Group Housing

    23 of 52 homes booked · 100% built · 46% of the promised time used · Q4 2025-26 filing · completion promised 31 Dec 2028

  • Leela

    SANCHETI REALTY · Belagavi · Residential/Group Housing

    4 of 19 homes booked · 100% built · 100% of the promised time used · Q4 2025-26 filing · completion promised 31 Mar 2026

  • Orionis Ozone

    VEETARAG VENTURES · Belagavi · Mixed Development

    30 of 30 homes booked · 100% built · 82% of the promised time used · Q4 2025-26 filing · completion promised 30 Nov 2026

  • Sairaj Exotica

    SAIRAJ BUILDERS · Belagavi · Residential/Group Housing

    15 of 19 homes booked · 100% built · 86% of the promised time used · Q4 2025-26 filing · completion promised 30 Jun 2026

  • SBM Pride

    M/s VEDIKA CONSTRUCTIONS · Belagavi · Mixed Development

    4 of 21 homes booked · 75% built · 91% of the promised time used · Q4 2025-26 filing · completion promised 30 Jun 2026

  • Shree Devamala Residency

    M/S PANARE BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    6 of 12 homes booked · 100% built · 68% of the promised time used · Q4 2025-26 filing · completion promised 26 Jul 2027

  • Swarna Griha - 4 Phase 1

    Felicity Adobe LLP · Belagavi · Residential/Group Housing

    336 of 338 homes booked · 100% built · 100% of the promised time used · Q4 2025-26 filing · completion promised 26 Jan 2026

  • Vrushabh Vijeta

    VRUSHABH VENTURES · Belagavi · Mixed Development

    6 of 16 homes booked · 100% built · 82% of the promised time used · Q4 2025-26 filing · completion promised 31 Dec 2026

  • Alora

    THE FORTUNE FIVE · Belagavi · Residential/Group Housing

    0 of 55 homes booked · 0% built · 25% of the promised time used · Q3 2025-26 filing · completion promised 30 Jun 2029

  • Amantran Anant Shubh Vihaar

    A S Developers · Belagavi · Residential/Group Housing

    1 of 15 homes booked · 65% built · 13% of the promised time used · Q3 2025-26 filing · completion promised 31 May 2027

  • Ambica Platinium

    ABHIJIT · Belagavi · Residential/Group Housing

    5 of 5 homes booked · 100% built · 100% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2025

  • Arinjay Empire

    ARINJAY CONSTRUCTIONS · Belagavi · Residential/Group Housing

    19 of 24 homes booked · 100% built · 77% of the promised time used · Q3 2025-26 filing · completion promised 15 Aug 2026

  • Exotica

    Nitin A Shirgurkar · Belagavi · Residential/Group Housing

    6 of 15 homes booked · 51% built · 45% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2028

  • Fortune Tower

    The Fortune Five · Belagavi · Mixed Development

    26 of 74 homes booked · 70% built · 75% of the promised time used · Q3 2025-26 filing · completion promised 31 Mar 2027

  • Gajraj Enclave

    SHREE GAJRAJ BUILDERS AND DEVELOPERS · Belagavi · Residential/Group Housing

    3 of 28 homes booked · 76% built · 33% of the promised time used · Q3 2025-26 filing · completion promised 30 Sept 2027

  • Ganesh Gardens

    SHREE SAMARTH CONSTRUCTIONS · Belagavi · Residential/Group Housing

    9 of 15 homes booked · 100% built · 93% of the promised time used · Q3 2025-26 filing · completion promised 31 Mar 2026

  • Honeywell Enclave

    SHUBHA SHANKAR DEVELOPERS · Belagavi · Residential/Group Housing

    2 of 44 homes booked · 100% built · 68% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2026

  • Keshav Vihar

    SHRIGURKAR REAALTYY PRIVATE LIMITED · Belagavi · Residential/Group Housing

    6 of 24 homes booked · 32% built · 23% of the promised time used · Q3 2025-26 filing · completion promised 30 Jun 2028

  • Marigold

    SHIRGURKAR REAALTYY PRIVATE LIMITED · Belagavi · Residential/Group Housing

    1 of 23 homes booked · 37% built · 25% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2027

  • Morya Enclave

    PARTH BUILDERS AND DEVELOPERS · Belagavi · Mixed Development

    9 of 15 homes booked · 100% built · 75% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2026

  • Royal Heritage Apartment

    SF Infrastructure · Belagavi · Mixed Development

    0 of 18 homes booked · 50% built · 2% of the promised time used · Q3 2025-26 filing · completion promised 1 Jun 2027

  • Rudraksha

    SHRI PARVATI CONSTRUCTION CO · Belagavi · Residential/Group Housing

    5 of 15 homes booked · 20% built · 8% of the promised time used · Q3 2025-26 filing · completion promised 31 Aug 2027

  • Shree Laxmi Arcade

    M/S. SHREE INFRABUILDS · Belagavi · Residential/Group Housing

    7 of 13 homes booked · 100% built · 38% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2027

  • Sunlight

    Sunlight Builders and Developers · Belagavi · Residential/Group Housing

    50 of 50 homes booked · 35% built · 61% of the promised time used · Q3 2025-26 filing · completion promised 10 Jan 2027

  • Vighnarajendra Ideal Homes

    M/s SHREE VIGHNARAJENDRA DEVELOPERS · Belagavi · Residential/Group Housing

    0 of 13 homes booked · 100% built · 89% of the promised time used · Q3 2025-26 filing · completion promised 31 Mar 2026

  • Westside Enclave

    SHRI PRAVEEN V DODDANAVAR · Belagavi · Mixed Development

    0 of 24 homes booked · 0% built · 4% of the promised time used · Q3 2025-26 filing · completion promised 15 Sept 2029

Hukkeri · 6 projects

  • Gajabarwadi Phase A

    ALTAF ABDULHAMID ATTAR · Hukkeri, Belagavi · Plotted Development

    19 of 40 plots booked · 61% developed · 92% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • Gajabarwadi Phase B

    IMRAN GAJABARSAB ATTAR · Hukkeri, Belagavi · Plotted Development

    37 of 64 plots booked · 100% developed · 92% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • RYN Layout

    ALLAUDDIN YAHYAKHAN NADAF · Hukkeri, Belagavi · Plotted Development

    40 of 50 plots booked · 98% developed · 65% of the promised time used · Q2 2026-27 filing · completion promised 3 Oct 2027

  • Surekha Enclave

    NAKSHATRA VENTURES · Hukkeri, Belagavi · Plotted Development

    40 of 410 plots booked · 98% developed · 91% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • Yargatti Layout

    MOHSIN SHARIF YARGATTI · Hukkeri, Belagavi · Plotted Development

    0 of 85 plots booked · 100% developed · 77% of the promised time used · Q2 2026-27 filing · completion promised 31 Dec 2026

  • Anushree Layout

    RADDI DEVELOPERS, PROP. PAVITRA SUNIL YARADDI · Hukkeri, Belagavi · Plotted Development

    1 of 40 plots booked · 100% developed · 54% of the promised time used · Q3 2025-26 filing · completion promised 31 Dec 2026

Athni · 1 project

  • Kulkarni Layout

    KIRAN PANDITRAO KULKARNI AND OTHERS · Athni, Belagavi · Plotted Development

    0 of 125 plots booked · 15% developed · 8% of the promised time used · Q2 2026-27 filing · completion promised 6 Nov 2029

Chikkodi · 1 project

  • Subhadra Layout

    RAMESH ATMARAM PAWAR · Chikkodi, Belagavi · Plotted Development

    5 of 349 plots booked · 53% developed · 59% of the promised time used · Q3 2025-26 filing · completion promised 31 Mar 2028

Builders in Belagavi

Figures are as the builders filed them with Karnataka RERA, read from the public portal. KRealtyX does not verify them and adds nothing to them. Projects that upload their updates as documents are not listed.